Preparatory Actions
Action A2: Technical studies required for concrete conservation actions.
 |
The following technical studies will be produced under this action: (a) Technical study for the construction parts in 13 buildings (action C2). (b) Technical study for the protection of five mine galleries (action C2). (c) Technical study for the creation of four ponds and one weir (action C1.1). (d) Technical study for the creation of three safe road passages (action C4).
|  |